OAMARU MITRE 10 MEGA – POST TENSIONED FLOOR POURED
The new Oamaru Mitre 10 Mega retail floor is now complete! The 3000m² post tension floor was poured over two consecutive days due to the

The new Oamaru Mitre 10 Mega retail floor is now complete! The 3000m² post tension floor was poured over two consecutive days due to the

Envision has successfully handed over the retail space to the Stage 2 anchor tenant. Kmart are now commencing their racking installation and are importing stock.

The Nevis superstructure continues to progress in Queenstown. The steel frame has reached the 3rd storey, with the team starting to turn their attention to

The 13,000m2 store with over 300 car parks opened to the public this morning allowing pre-Christmas trading to commence. Detailed planning by the Envision team

Construction works have commenced at Mitre 10 MEGA Oamaru. Envision has been engaged to project, design and construction manage this new 5000m² retail store which

Just in time for Christmas, the nursery and Colombus Coffee café is now open at the Papanui, Mitre 10 MEGA. Work continues on the completion

Daily concrete pours for the internal retail areas of the Bunnings store are continuing as part of over 2,000m3 of concrete to be poured in

Structural steel to the main warehouse continues with multi-bay rafter and purlin sections being constructed at ground level and lifted into position on the portal